This page requires Javascript in order to provide all functionalities. Please enable Javascript.
This page requires Cookies in order to provide all functionalities. Please enable Cookies. SEA - Sustainably Engineering Architecture - Design, Management, Monitoring
logo

SEA - Sustainably Engineering Architecture

Design, Management, Monitoring

Test
Click on image to enter
Please wait - Content charging.

Categories

Typology : Housing : Houses
Year : 2015
Status : Study

Project data

Situation : Magé, RJ Brazil
Area : 135m² Construction
Budget : 350'000 R$ Excl. VAT Construction

Mission

Period : 06.2015 10.2015
Mission :
  • Ph. 2 PRELIMINARY STUDIES
  • Ph. 3 PROJECT PLANNING
Engagement : Authorship

Contributors

Project pilot

 

SEA - Sustainably Engineering Architecture

Roman Schirmer Architect

  • Clarification of the technical, legal, economic and environmental framework. Concept proposal and feasibility check.
  • Calculation of volumes and areas. Cost estimate of the preliminary project +/- 15%.
  • Sketch/conceptual design: analysis of intentions, needs and programme in the development of an architectural concept translated into a sketch.
  • Pre-project: refinement of the sketch with the help of experts. Drawing up a construction and material concept.

Technics

  • Topography
  • Wood carpentry
  • Wood joinery
  • Special constructions in wood joinery

Concepts

  • Continuity
  • Slope
  • Framings
play-pause
House at the rock